Skip to Content
Scepi Smart EMS for office buildings and commercial properties

Scepi Smart EMSScepi Smart EMS for office buildings and commercial properties

Building services, tenant use and operating hours together.

30-minute introductory discussion · no obligation

Scepi Smart EMS for office buildings and commercial properties: operating environment illustration
Application illustration, not a customer installation.
An industry configuration of Smart EMS

Operating challenges

Scepi Smart EMS connects an office building's meters and accessible BMS data. Energy used by heating, cooling, ventilation, lighting and charging can be tracked alongside zone usage and operating hours.

01

Measurement

Separating energy use by tenant, zone and common area.

02

Operating context

Investigating night-time and weekend baseload and differing schedules.

03

Events and comparisons

Comparing HVAC and lighting operating hours with actual use.

04

Scoped integration

A shared view of site loads from solar PV, charging and building services.

From data to a decision

Measure the right things

Compare like-for-like operating periods and investigate changes before attributing them to an energy action.

kWh / m² within comparable usage categorieskWh / m² within comparable usage categories
Night-time and weekend baseloadNight-time and weekend baseload
Energy by tenant and common areaEnergy by tenant and common area

Operating hours and time outside comfort limits. Sensor and data-source compatibility is assessed during scoping.

The shared platform

A shared view of operations

Smart EMS brings accessible meter and operating data together. Monitor provides visibility; Executive supports analysis and reporting; Autopilot adds approved control. Interfaces, alerts, retention and integrations are scoped for the site.

Explore the platform
Scepi Smart EMS consumption heatmap
Example product interface. Figures are illustrative; the available views depend on the selected plan and integrations.
Annual software licence

Choose the capabilities you need

The same software tiers apply across industries. Industry-specific sensors, interfaces and workflows are implemented as a separate project.

See.

EMS Monitor

99,000 HUFnet / site / year + VAT

A shared view of site consumption, production and basic energy costs.

Plan details and scope
Control.

EMS Autopilot

399,000 HUFnet / site / year + VAT

Approved automatic control within agreed operating limits.

Plan details and scope

Hardware, implementation, operations and optional modules are separate costs. Prices are net of VAT. Full comparison

Transparent assumptions

What could it mean financially?

Annual energy cost, excluding VAT, for the common and tenant areas in scope, separated by the party paying the cost.

Illustrative scenario

Calculate with your own figures

The starting figures are editable examples, not measured customer data or promised savings. All amounts are net of VAT, in Hungarian forints.

annual licence / site

The annual licence is charged per site.

The combined annual cost of all sites entered.

Estimated effect of subsequent actions; 0% is a valid assumption.

Hardware, survey, installation, integration and any module setup. Editable example; project pricing depends on a site assessment.

Operations, connectivity and selected module fees. This example is not a quotation; replace it with the actual total cost.

The calculator does not transmit or store the figures you enter.

Estimated annual net benefit1,501,000 HUF

Assumed savings minus annual software and other recurring costs.

The estimated annual net benefit is positive.

Simple payback period
19.2 months
First-year investment ROI
-37.5%
Gross annual savings
1,800,000 HUF
Energy savings
1,800,000 HUF
Annual software licence
199,000 HUF
Other annual costs
100,000 HUF
Total annual recurring costs
299,000 HUF
Total first-year cost
2,699,000 HUF
Energy saving needed to cover annual costs0.83%

With the entered water savings; excluding the one-off investment.

If actual savings differ

If actual savings differ
AssumptionAnnual net benefit
Half the entered rate601,000 HUF
The entered rate1,501,000 HUF
1.5 times the entered rate2,401,000 HUF

Uses 50%, 100% and 150% of the entered energy and water saving rates, capped at 100% savings. A sensitivity analysis, not a forecast.

How is this calculated?

Annual net benefit = energy cost × energy saving rate + water cost × water saving rate − annual licence − other annual costs. Payback = one-off investment / annual net benefit. First-year ROI = (annual net benefit − one-off investment) / one-off investment × 100%.

The model assumes constant annual costs and savings. It excludes financing, tax, inflation, discounting and residual value. Measurement supports decisions; savings require validated actions and follow-up measurement. Food safety, process and operational limits take priority.

List prices checked: 28 September 2026. Plans and included services.

What must be measured

Measured reductions in unnecessary HVAC and lighting operating hours. Verified reductions in energy or related contractual costs.

The calculator includes only the energy and water cost buckets entered above. Capacity, avoided damage and other value must be evaluated separately from evidence.

Implementation

Start with a defined measurement scope.

We define the decision to support, the data needed and the operating limits before implementing the integration.

  • A meter hierarchy and clarity on which costs the owner and tenants bear.
  • Available access and control interfaces in the existing BMS.
  • Agreed comfort limits, usage schedules and local overrides.
  1. Survey and scope

    Meter list, interfaces, responsibilities and a comparable baseline.

  2. Connect and verify

    Connect the required data, test timestamps, gaps and alerts.

  3. Act and measure again

    Approve any control rules, test fallback and manual override, then measure results against the agreed baseline.

Frequently asked questions

Questions worth clarifying.

Does Smart EMS replace the building's BMS?

Not necessarily. Accessible BMS data can support a shared energy view, reporting and approved control connections. The division of responsibilities is determined by an assessment of the existing system.

Can it be used to allocate tenant costs?

With appropriate submetering, consumption can be assigned to tenants or zones. Conditions for billing use must be clarified separately based on the meters, data quality and lease agreements.

Whose return on investment does the page calculate?

Compare the investment and savings for the party that bears the related costs. The financial effect may differ for the owner and tenant; the same saving must not be counted twice as a benefit to both.

What does the annual licence include?

Monitor, Executive and Autopilot are annual per-site software licences. Meters, hardware, integration, implementation, operations and optional modules are separately scoped and priced. The calculator uses the published licence prices and editable project budgets.

Next step

Let’s look at your site.

Bring an energy bill, a meter list and the operating question you want to resolve. We can use them to define a practical first step.

Book a free consultation

30-minute introductory discussion · no obligation

Content and public licence prices reviewed: 28 September 2026. · Scepi Consulting